History

CERI’s Major Achievements

  • 1964 First industrialized 30t BOF Plant

  • 1974 First localized 120t BOF Plant

  • 1978 First in-house 4.2m heavy plate mill

  • 1992 Top world level seamless steel pipe complex

  • 1997 First large revamping 4063m³ BF

  • 2004 10 MT/Y zero waste steel complex

    First localized 300t BOF Plant

  • 2005 First 5m heavy plate mill

  • 2008 First self-developed 120t VHP EAF

  • 2011 World largest round bloom CCM (Φ1,000mm)

  • 2014 Ultra thick slab CCM (2600mm x 450mm)

  • 2016 First industrialized CASTRIP line in China