中文
|
ENGLISH
HOME
ABOUT CERI
Company Profile
Address by Chairman
Organization Structure
Enterprise Qualification
NEWS
News
BUSINESS
Metallurgy
Urban construction
Water Treatment
Consultation
Global Network
R&D
Innovation System
Codes and Standards
Awards
CONTACT
Contact us
Customer suggestions
Current Location:
Home
>
NEWS
>
News
News
News
1# heating furnace in the 1,450 mm hot rolling line of ESSB was ignited
2024/12/17
CERI: uses "Intelligence" as the engine to stimulate the transformation and upgrading for new quality productive forces
2024/12/17
CERI's "Smart Industrial Microgrid Energy Management and Control System" was selected as one of the typical cases of IoT-empowered industry development in 2024
2024/12/17
Hot commissioning of Zhoukou Steel 5,600 mm wide and thick rough rolling mill supply project succeeded
2024/12/17
Hot commissioning of 2-strand slab caster in the 3# Slab Caster Project of Guangxi Iron & Steel Group Co., Ltd. succeeded
2024/12/17
Hot commissioning of double-housing rolling mills in 3,800 mm wide and thick plate production line project of Guangxi Iron & Steel Group Co., Ltd. succeeded
2024/12/16
Wharf material incoming system in CERI ESSB Phase II 2.7 MT Project has efficiently improved logistics at ESSB port
2024/12/16
Helping HBIS Tangsteel realize its dream of a world-class modern coastal iron and steel base
2024/12/16
Virtual Plant Project of 5500 Thick Plate Production Line of Ansteel Bayuquan Branch passed completion acceptance
2024/12/16
CERI: Driving Innovation and Momentum in Steel Rolling Core Technologies
2024/12/16
CERI: Enhancing Core Technologies for Green, Efficient, Professional, and Integrated Ironmaking with Longevity
2024/12/16
A new generation of VFD products released by CERI indicates the industrial "new quality productive forces" injected by China-made high-end intelligent equipment
2024/10/17
The hot test for the widest thick plates in China completed
2024/10/17
CERI attended ANKIROS/ANNOFER/TURKCAST 2024 in Turkey
2024/10/17
CERI and SMZ of Uzbekistan signed a supply contract for a continuous annealing line
2024/10/17
No.3 heating furnace in 3,800 mm wide and thick plate production under the CERI's general contracting for Guangxi Iron & Steel Group Co., Ltd. was ignited successfully for heating up
2024/10/17
CERI: ushers in a new chapter of green and low-carbon development in the industry with innovation
2024/10/17
Hot test run of a new six-roller and six-stand pickling line-tandem cold mill constructed by CERI for Rizhao Yulan succeeded
2024/10/17
CERI helped Ulanhot Steel of Jingye Group to create a new benchmark for the double high-speed bar production line in the industry
2024/10/17
CERI's two scientific and technological achievements are included in the List of Leading Technologies by "Innovation China"
2024/10/16
The intelligent manufacturing system built by CERI Digital Technology Co., Ltd. for Taiyuan Heavy Casting & Forging Sub-Co., TYHI was fully launched
2024/10/16
CERI assisted Fujian Provincial Sansteel (Group) Co., Ltd. in establishing a quality demonstration production line for medium- and large-diameter bars.
2024/10/16
Shanxi Jingang Phase II Intelligent Manufacturing System built by CERI goes online
2024/10/16
CERI's Technical Requirements for Intelligent Power Grid Control System in Iron and Steel Industry passed expert review
2024/10/16
HBIS Group Hansteel's New Area with the overall design and EPC generally contracted by CERI holds full operation ceremony
2024/10/16