中文
|
ENGLISH
HOME
ABOUT CERI
Company Profile
Address by Chairman
Organization Structure
Enterprise Qualification
NEWS
News
BUSINESS
Metallurgy
Urban construction
Water Treatment
Consultation
Global Network
R&D
Innovation System
Codes and Standards
Awards
CONTACT
Contact us
Customer suggestions
Current Location:
Home
>
NEWS
>
News
News
News
A new generation of VFD products released by CERI indicates the industrial "new quality productive forces" injected by China-made high-end intelligent equipment
2024/10/17
The hot test for the widest thick plates in China completed
2024/10/17
CERI attended ANKIROS/ANNOFER/TURKCAST 2024 in Turkey
2024/10/17
CERI and SMZ of Uzbekistan signed a supply contract for a continuous annealing line
2024/10/17
No.3 heating furnace in 3,800 mm wide and thick plate production under the CERI's general contracting for Guangxi Iron & Steel Group Co., Ltd. was ignited successfully for heating up
2024/10/17
CERI: ushers in a new chapter of green and low-carbon development in the industry with innovation
2024/10/17
Hot test run of a new six-roller and six-stand pickling line-tandem cold mill constructed by CERI for Rizhao Yulan succeeded
2024/10/17
CERI helped Ulanhot Steel of Jingye Group to create a new benchmark for the double high-speed bar production line in the industry
2024/10/17
CERI's two scientific and technological achievements are included in the List of Leading Technologies by "Innovation China"
2024/10/16
The intelligent manufacturing system built by CERI Digital Technology Co., Ltd. for Taiyuan Heavy Casting & Forging Sub-Co., TYHI was fully launched
2024/10/16
CERI assisted Fujian Provincial Sansteel (Group) Co., Ltd. in establishing a quality demonstration production line for medium- and large-diameter bars.
2024/10/16
Shanxi Jingang Phase II Intelligent Manufacturing System built by CERI goes online
2024/10/16
CERI's Technical Requirements for Intelligent Power Grid Control System in Iron and Steel Industry passed expert review
2024/10/16
HBIS Group Hansteel's New Area with the overall design and EPC generally contracted by CERI holds full operation ceremony
2024/10/16
CERI's technological achievements of "Online dynamically adjusted high-strength steel wide and thick plate straightener" reaching the international advanced level
2024/10/15
CERI: focus on further transformation and upgrading of metallurgical brands under the guidance of scientific and technological innovation
2024/10/15
No.1 Blast Furnace Overhaul Project of Hebei Yanshan Iron and Steel Group was tapped
2024/06/12
The Waste Heat Power Generation Works of Coking and Power Generation Project of Hebei Taihang Iron and Steel Group passed completion acceptance
2024/06/12
CERI Attend 2024 National Ironmaking Production Technology Conference and Academic Annual Conference
2024/06/12
CERI Participate in Siemens Digital Industries Partner Conference 2024 and granted the Most Outstanding Partner Award
2024/06/12
The Electric Control System Upgrading for No.3 Rotary Shear on the High-speed Wire and Rod Production Line I in operation at Shuicheng I & S
2024/06/12
The 3,800 mm Medium Plate Hot Straightener Project in operation at Bayuquan Steel Branch of Ansteel
2024/06/12
The No.2 Heating Furnace for 3,500 mm wide and thick plates in Tongling was ignited
2024/06/12
The No.4 Galvanizing Line of Cold Rolling Project Phase II in operation at Hebei Jingye Group
2024/06/12
The Bar Mill Main Transmission Upgrading Project in operation at KISC
2024/06/12