Urban Water Supply

CERI focuses on the research, development, and application of a full range of urban water supply products, and has established the most trusted brand image of urban water supply experts. Water supply products include a series of products such as surface water supply treatment, advanced treatment of micro-polluted supply water source, long-distance water pipeline, water supply pipe network, intelligent water management, etc.

  • Large-scale Surface Water Supply Treatment

  • Advanced Treatment of Micro-polluted Supply Water Source

  • Long-distance Water Pipeline

  • Rural Drinking Water

  • Water Supply Pipe Network

  • Intelligent Water Management

  • References

    Chengdu Wenjiang District Jinqiang Shouan Waterworks (Phase I and Phase II) Project

    The total water supply capacity of the Project is 400,000 m³/d, covering an area of 6.65h㎡. Its main process is high-efficiency clarifier + V-type filter. Its construction period (from the start to reaching the water supply quality standard) is only 8 months, creating a precedent for similar projects. The Project simplifies the operation process, improves the stability, reliability and treatment effect of the system, and saves the operating cost. It won the Second Prize of Excellent Project Management Achievement of China National Construction Projects in 2014.

    Hengshui Binhu New District Water Purification Plant and Water Distribution Pipe Network EPC Project

    The Owner of the Project is Hebei Hengshui Lake National Nature Reserve Management Committee. Its designed daily water supply capacity is 30,000m³/d. The Project also includes the design and construction of 90km water supply pipe network. The Project adopts activated carbon adsorption + chlorine dioxide pretreatment + grid flocculation as the main process, which is reasonable, advanced, efficient and energy-saving with small maintenance workload. The problem that there is no centralized water supply in Binhu New District is solved with the Project, which meets the water demand of urban development and economic construction in Binhu New District, and improves the safety of urban water supply.

Sewage Treatment and Sludge Treatment

CERI is committed to the research, development and application of related technologies and products of municipal sewage treatment and reuse. Its products include a series of products such as municipal sewage treatment, municipal reclaimed water treatment, new urbanization sewage treatment and industrial park sewage treatment. The achievements have been put into use in several projects in Beijing, Hengshui, Cangzhou, Jieyang, Qionglai, Huaying, Zigong, Suining, etc., with stable and reliable application. 

  • Supporting Sewage Treatment plants in Cities and Economic Development Zones

  • Sewage Treatment in Small Towns and New Villages

  • Sludge Treatment

  • References

    Lu'an Yeji Economic Development Zone Sewage Treatment Plant Project

    The Project is adjacent to Sungang Village in the north, and adjacent to Shanghai-Shaanxi Expressway and Sungang Village in the south, covering an area of 0.03k㎡, with a service area of 13.9k㎡ and a treatment capacity of 10,000 m³/d. It adopts the tertiary treatment process with pretreatment + AAO biochemical tank + advanced oxidation + filtration process as the main process. Since the incoming water COD contains refractory organic matter, it is difficult to have the water after the primary biochemical treatment to meet the requirements. Therefore, Fenton advanced oxidation is adopted after the primary biochemical treatment, and then the secondary biochemical + filtration treatment process is carried out to ensure that the water COD meets the standard.

    Qinhuangdao Economic and Technological Development Zone Shaanxi North Road Sewage Treatment Plant Project

    The designed water supply capacity of the Project is 20,000m³/d. It adopts hydrolysis acidification AAO biochemical tank + high efficiency sedimentation tank + fiber rotary filter + ozone as the main process. Such process solves the problems of low COD content in incoming water, and thus makes the incoming water easier to be treated through biochemical process, and also has a good effect of nitrogen and phosphorus removal.

    Hengshui Lake New District Sewage Treatment Plant Phase I Project

    The total water supply capacity of the Phase I of the Project is 10,000m³/d, covering an area of 36,376.37㎡. The Project adopts tertiary treatment process with biochemical pool + denitrification deep bed filter as the main process. It has the advantages of high water quality standard, small land occupation, high resistance to shock load , low energy consumption, low investment, simple operation and management, etc. It is greatly beneficial to municipal sewage treatment under high discharge standard.

    Gu'an AMOLED Sewage Treatment Plant Project

    The Project is located in the southwest of Gu'an County, adjacent to Daguang Expressway on the east side, covering an area of about 0.07k㎡. Its total scale is 60,000m³/d, of which 30,000m³/d is sanitary sewage and 30,000m³/d is industrial wastewater. The process of "regulation + reaction precipitation + hydrolysis acidification + improved AAO tank + filter cloth filter + activated carbon filter + ultra-filtration and reverse osmosis" is adopted for industrial wastewater. The process of "improved AAO tank + filter cloth filter" is adopted for sanitary sewage. The Project is equipped with emergency tank and reaction sedimentation tank to improve the safety of the treatment system, and hydrolysis acidification tank is provided to improve the biodegradability of industrial wastewater.

Comprehensive Treatment of River

CERI is committed to the development and application of comprehensive river and lake treatment technology which combines the waterlogging prevention and control, river and lake water quality improvement, ecology and landscape. Its business mainly includes riverside ecological restoration (ecological revetment, ecological floating island and submerged plant restoration), black and odorous water body treatment of rivers and lakes (emergency treatment, intensified decontamination and sediment treatment) and landscape treatment. CERI has completed many design, construction and PPP projects in Jiaozuo, Zhoukou, Xinmi, Pingxiang, Nanning, Fuzhou and other regions.

  • Comprehensive Treatment of River

  • Urban Rainwater Drainage System

  • References

    Water System Comprehensive Treatment Project in Cangshan Convention and Exhibition Center Area of Fuzhou City

    The Water System Comprehensive Treatment PPP Project in Cangshan Convention and Exhibition Center Area of Fuzhou City includes two sub-projects. The construction of sub-project I includes river earthwork excavation, revetment masonry and other connection projects, sewage interception and storage system, spread sewage collection and treatment system, dredging, revetment ecological transformation, green belt and footpath construction along the river, full-section online monitoring system and other ecological restoration measures such as oxygenation, plug flow, water replenishment, floating bed and water quality improvement. The Sub-project II is the systematic renovation “sponge” project in the area, and the construction contents include sunken green space, biological detention facilities, permeable pavement, green roof and other storage facilities, etc.

    Water System Comprehensive Treatment Project in Xindian Area of Fuzhou City

    The Water System Comprehensive Treatment Project in Xindian Area of Fuzhou City includes 9 river courses, which reach Bayi Reservoir and Forest Park in the north, Nanfu Railway in the south, Efeng and Yangting Reservoir in the east and Xizhuang Road in the west. The whole water area is 21k㎡, and the total length of the river courses is about 22.6km.

    Nanning Shajiang River Basin Comprehensive Improvement Project

    The main contents of the Project include river treatment project, ecological restoration and water replenishment project, river sewage interception and pipe network project, sewage purification plant construction project, sponge city construction project, environmental landscape project, information monitoring project, etc. The total length of the treated river is 8.59km, and the river width is 30-300m. The Project has built a new sewage treatment plant of 50,000 tons/day, three tail water purification wetlands of sewage purification plant, three river monitoring stations, three water quality monitoring stations, one automatic meteorological monitoring station and other information monitoring system platforms.

    Comprehensive Treatment Project of Zhadagai River in Hohhot

    The Project starts from Ordos Street and ends at Xiaoheihe River. It covers a section of river with a length of 5073m. The main construction contents include flood prevention and control, landscape , environmental protection and municipal works. The Project focuses on the river water system construction, combined with the riverside loop design, flood dike design, green space system construction and urban infrastructure construction. River urban characteristic landscape is formed through the implementation of comprehensive development and construction.

Industrial Water Treatment and Zero Discharge

CERI is committed to the research, development and application of technologies of fresh industrial water treatment and chemical water preparation, industrial sewage and wastewater treatment and reuse, industrial wastewater treatment and reuse of high difficulty, and concentrated brine treatment. The achievements have been put into use in Beijing, Tianjin, Tangshan, Chengde, Xuanhua, Yingkou, Anyang, Benxi, Ningxia, etc., with advanced system indicators, stability and reliability.

  • Industrial Fresh Water Treatment and Chemical Water Preparation

  • Industrial Wastewater Treatment and Reuse

  • Industrial Wastewater Treatment of High Difficulty

  • Concentrated Brine Treatment

  • References

    75,000t/day Membrane Desalination EPC Project and 25,000t/day Thermal Desalination BOT Project of Hebei Fengyue Energy Technology Co., Ltd.

    The Project capacity is 100,000m³/d, and the water source is Bohai Sea water.

    75,000t/day Membrane Desalination EPC Project and 25,000t/day Thermal Desalination BOT Project of Hebei Fengyue Energy Technology Co., Ltd.

    The Project capacity is 100,000m³/d, and the water source is Bohai Sea water.

    Water Supply Treatment Center Project of Minmetals Yingkou Medium Plate Plant

    The final water supply capacity of the Project is 150,000 m³/d, which is constructed in two phases (all the civil works are completed in Phase I ), with 75,000 m³/d in Phase I and 75,000 m³/d in Phase II. The final water supply capacity with advanced treatment is 120,000 m³/d (60,000 m³/d respectively in Phase I and Phase II). The concentrated water produced by advanced treatment is treated by reverse osmosis process, and the demineralized water yield is 11,000 m³/d respectively in Phase I and Phase II. The water yield of concentrated brine is 9,000 m³/d respectively in Phase I and Phase II. The pretreatment process adopts high-efficiency clarifier + V-type filter, and the advanced treatment process adopts ultra-filtration system + reverse osmosis system (concentrated water re-reverse osmosis).

    Water Supply Treatment Center Project of Minmetals Yingkou Medium Plate Plant

    The final water supply capacity of the Project is 150,000 m³/d, which is constructed in two phases (all the civil works are completed in Phase I ), with 75,000 m³/d in Phase I and 75,000 m³/d in Phase II. The final water supply capacity with advanced treatment is 120,000 m³/d (60,000 m³/d respectively in Phase I and Phase II). The concentrated water produced by advanced treatment is treated by reverse osmosis process, and the demineralized water yield is 11,000 m³/d respectively in Phase I and Phase II. The water yield of concentrated brine is 9,000 m³/d respectively in Phase I and Phase II. The pretreatment process adopts high-efficiency clarifier + V-type filter, and the advanced treatment process adopts ultra-filtration system + reverse osmosis system (concentrated water re-reverse osmosis).

    Water Supply Treatment Center Project of Minmetals Yingkou Medium Plate Plant

    The final water supply capacity of the Project is 150,000 m³/d, which is constructed in two phases (all the civil works are completed in Phase I ), with 75,000 m³/d in Phase I and 75,000 m³/d in Phase II. The final water supply capacity with advanced treatment is 120,000 m³/d (60,000 m³/d respectively in Phase I and Phase II). The concentrated water produced by advanced treatment is treated by reverse osmosis process, and the demineralized water yield is 11,000 m³/d respectively in Phase I and Phase II. The water yield of concentrated brine is 9,000 m³/d respectively in Phase I and Phase II. The pretreatment process adopts high-efficiency clarifier + V-type filter, and the advanced treatment process adopts ultra-filtration system + reverse osmosis system (concentrated water re-reverse osmosis).