Mining

  • Mining
  • Concentration
  • Tailing Utilization

CERI has completed overall design and general contracting for the largest scale iron ore mines in China, i.e.

Underground mine with capacity of 15,000,000t/y raw ore with the underground filling method

Open pit mine with capacity of 21,000,000t/y based on its proprietary optimized design software

Main technical features

CERI mining equipment is characterized by large-scale, advanced automation, smart solutions, high mining efficiency and low cost operation.

Key Projects

Bayan Obo West Mine Mining and Beneficiation Project

Sijiaying Iron Ore Mining and Beneficiation Project

Shougang Iron Ore Mining and Beneficiation Project

Lilou Iron Ore Mining and Beneficiation Project

  • Bayan Obo West Mine Mining and Beneficiation Project

    Location: China
    Project scope:
    Mining scale is 15 million t/y, crushing 15 million t/y, beneficiation 10 million t/y, and conveying pipeline 145km
    Startup date: 2009
    Award:
    First prize of “Excellent Engineering Design in National Metallurgical Industry”
  • Sijiaying Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    Sijiaying open-pit mine has ore exploitation capacity 21 million t/y and total stripping 135 million t/y, beneficiation 7 million t/y with advanced ore separation process
    Startup date: 2004
    Award:
    First prize of “Excellent Engineering Design In National Metallurgical Industry”
  • Shougang Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale of this open pit mine is 11 million t/y, total stripping 54 million t/y and beneficiation plant is 18 million t/y which is the largest one in China. It also has the largest tailings pond and a 201.5m height dam.
    Startup date: 2006
    Award:
    National level green mine and tailings pond project
    Second prize of “Excellent Engineering Design of Ministry of Metallurgical Industry”
  • Lilou Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale for mining and beneficiation is 7.5 million t/y, magnetite ore treatment 2.5 million t/y, specularite ore treatment 5 million t/y and iron concentrate fines 2.8 million t/y.
    Startup date: 2008
    Technology highlight:
    The Lilou mine is the largest black underground mine and the only beneficiation plant with magnetite and specularite ore in China
    Award:
    First prize of “National Metallurgical Industry Excellent Engineering Design” for mining project and second prize of “National Metallurgical Industry Excellent Engineering Design” for beneficiation project.

CERI has successfully completed numerous concentration plants based on its proprietary technology, i.e.

The largest single-magnetic separation of raw ore mine in China with a capacity of 18,000,000t/a

The largest single-floating separation of raw ore mine in China with a capacity of 9,000,000t/a

The largest magnetic-floating separation of raw ore mine in China with a capacity of 15,000,000t/a

Main technical features

Mineral separation engineering and design is characterized in treatment of various ores of complex structures, i.e. desulfurization, dephosphorization, silicon reduction, etc. and effective recycling of valuable elements such as sulfur, phosphorous, tin, rare earths, niobium, copper, cobalt, etc., thus significantly increasing the economic benefits.

Key Projects

Bayan Obo West Mine Mining and Beneficiation Project

Sijiaying Iron Ore Mining and Beneficiation Project

Shougang Iron Ore Mining and Beneficiation Project

Lilou Iron Ore Mining and Beneficiation Project

  • Bayan Obo West Mine Mining and Beneficiation Project

    Location: China
    Project scope:
    Mining scale is 15 million t/y, crushing 15 million t/y, beneficiation 10 million t/y, and conveying pipeline 145km
    Startup date: 2009
    Award:
    First prize of “Excellent Engineering Design in National Metallurgical Industry”
  • Sijiaying Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    Sijiaying open-pit mine has ore exploitation capacity 21 million t/y and total stripping 135 million t/y, beneficiation 7 million t/y with advanced ore separation process
    Startup date: 2004
    Award:
    First prize of “Excellent Engineering Design In National Metallurgical Industry”
  • Shougang Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale of this open pit mine is 11 million t/y, total stripping 54 million t/y and beneficiation plant is 18 million t/y which is the largest one in China. It also has the largest tailings pond and a 201.5m height dam.
    Startup date: 2006
    Award:
    National level green mine and tailings pond project
    Second prize of “Excellent Engineering Design of Ministry of Metallurgical Industry”
  • Lilou Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale for mining and beneficiation is 7.5 million t/y, magnetite ore treatment 2.5 million t/y, specularite ore treatment 5 million t/y and iron concentrate fines 2.8 million t/y.
    Startup date: 2008
    Technology highlight:
    The Lilou mine is the largest black underground mine and the only beneficiation plant with magnetite and specularite ore in China
    Award:
    First prize of “National Metallurgical Industry Excellent Engineering Design” for mining project and second prize of “National Metallurgical Industry Excellent Engineering Design” for beneficiation project.

CERI leverages dry tailing disposal and tailing concentration technologies to improve tailing safety and environmental protection. CERI has completed the design for the largest tailing ponds in China. CERI’s propriety automation control system for “long-distance conveyor of large-scale mine tailing” applied in tailing engineering design has been well recognized by Mining Industry.

Key Projects

Bayan Obo West Mine Mining and Beneficiation Project

Sijiaying Iron Ore Mining and Beneficiation Project

Shougang Iron Ore Mining and Beneficiation Project

Lilou Iron Ore Mining and Beneficiation Project

  • Bayan Obo West Mine Mining and Beneficiation Project

    Location: China
    Project scope:
    Mining scale is 15 million t/y, crushing 15 million t/y, beneficiation 10 million t/y, and conveying pipeline 145km
    Startup date: 2009
    Award:
    First prize of “Excellent Engineering Design in National Metallurgical Industry”
  • Sijiaying Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    Sijiaying open-pit mine has ore exploitation capacity 21 million t/y and total stripping 135 million t/y, beneficiation 7 million t/y with advanced ore separation process
    Startup date: 2004
    Award:
    First prize of “Excellent Engineering Design In National Metallurgical Industry”
  • Shougang Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale of this open pit mine is 11 million t/y, total stripping 54 million t/y and beneficiation plant is 18 million t/y which is the largest one in China. It also has the largest tailings pond and a 201.5m height dam.
    Startup date: 2006
    Award:
    National level green mine and tailings pond project
    Second prize of “Excellent Engineering Design of Ministry of Metallurgical Industry”
  • Lilou Iron Ore Mining and Beneficiation Project

    Location: China
    Project scope:
    The scale for mining and beneficiation is 7.5 million t/y, magnetite ore treatment 2.5 million t/y, specularite ore treatment 5 million t/y and iron concentrate fines 2.8 million t/y.
    Startup date: 2008
    Technology highlight:
    The Lilou mine is the largest black underground mine and the only beneficiation plant with magnetite and specularite ore in China
    Award:
    First prize of “National Metallurgical Industry Excellent Engineering Design” for mining project and second prize of “National Metallurgical Industry Excellent Engineering Design” for beneficiation project.